The Tile Order Process: From Enquiry to Dispatch

Published Nov 26, 2026

The Tile Order Process: From Enquiry to Dispatch

An export tile order moves through a fixed sequence of stages. Knowing them helps you plan your own stock, cash flow and shipping, and it shows you where delays usually appear. Exact timings depend on the order, so treat this as a map and not a timetable.

The stages in order

Stage 1: enquiry

Everything starts with a clear request. The more precise it is, the faster and more accurate the answer. Include:

  • Sizes, thicknesses and surfaces you want.
  • Designs, or the look you are after.
  • Approximate quantities for each line.
  • Destination port and preferred Incoterm.
  • Any packing, labelling or document requirements.

A vague enquiry such as "send me a quote for tiles" produces vague replies and wastes a week.

Stage 2: quotation

The supplier replies with a quotation covering the items, quantities, packing, Incoterm, payment terms and an expected dispatch window. Read it line by line and check that every item matches your enquiry. Raise questions now, because changes after production starts are expensive.

Stage 3: confirmation and design approval

You confirm the order and agree the design list, grade and packing. This is when you also clarify tolerance for shade and size. Agree these points in writing, because they become the standard the cargo is judged against.

Take your time here. You can check the sizes and surfaces in the catalogues before approving.

Stage 4: production or allocation

Lumina Tile sources from Morbi factories. Depending on the design, some lines come from existing stock and others are produced to order. Production time depends on how many lines the order has, which factories are involved, the surface and how busy the cluster is.

This is where lead times vary most. Larger formats, special surfaces and designs that need fresh production take longer than items already in stock. Ask for the expected date for each line and not only for the whole order.

Stage 5: grading and packing

Tiles are sorted by grade, shade and calibre, then packed and palletised to the agreed specification. This is the best point to ask for photographs or an inspection, to confirm tiles match the agreed grade. Packing for each size is described on the packaging details page.

Stage 6: loading and documents

The container is loaded, secured and sealed, and the shipping documents are prepared. Check the packing list and invoice against your purchase order before the cargo leaves. Confirm with your customs broker which documents your country requires.

Stage 7: dispatch and shipping

The container travels to the port and onto the vessel. Sea transit depends on the destination and the sailing schedule, and the quote or your forwarder will give the expected arrival. Delays at this stage come from vessel schedules, port congestion and weather, none of which any supplier controls.

What drives lead time

FactorEffect
Number of linesMore lines mean more coordination
Stock or fresh productionFresh production adds time
Size and surfaceLarge formats and special finishes take longer
Approval speedSlow design approval pushes everything back
Payment termsProduction often starts after agreed payment
Season and port conditionsPeak periods can slow booking and loading

Keeping your side of the schedule

Buyers influence lead time more than they expect. Prepare your document checklist early, line up your customs broker and freight forwarder before the container is ready, and arrange storage so the cargo can be unloaded promptly. If you pay by a method that takes days to clear, allow for it in your plan.

Keep one point of contact on each side and confirm decisions in writing. That prevents a delay caused by two people giving different instructions.

Plan for repeat orders

The first order is the slowest, because designs, packing and documents are agreed from scratch. Repeat orders move faster when the specification is already recorded. Keep your approved design list, packing details and document checklist, and reuse them when you reorder.

It also helps to place the next order before your stock runs low. Given production and sea transit, ordering at the last moment almost guarantees a gap on your shelves. Work backwards from the date you expect to run out, add the quoted dispatch window and the transit time, and add a margin for port and customs delays.

Common questions

How long will my order take?

It depends on the factors above. Ask for a confirmed dispatch window in the quotation, line by line, instead of relying on a general estimate.

What can I do to speed things up?

Send a complete enquiry, approve designs quickly and answer questions the same day. Most delays begin on the buyer's side or in unclear specifications.

Where can I read more about the process?

The export page summarises how shipments are handled.

When you are ready to start, send your enquiry to Lumina Tile with your size list, quantities and destination port.